We have recently received data from a CSO survey that shows the continuation pipe with a 225mm hole cored into the bottom of the pipe. The flows drop down this hole into a deeper sewer with flows conveyed downstream.

Has anyone any experience in the best way to represent this 225mm "hole"

Any help would be appreciated.

Thanks