
Originally Posted by
Alan Stuemke
Patrick,
The situation covered in Tutorial 3 of the User Guide only involves adding new pipes to a network. However, when the situation involves upsizing existing pipes the use of new Facility Sets (based on a single attribute field) gets much more complicated, because of the impact to ALL the other scenarios. In the situation I am working on I added pipes parallel to the existing pipes but with a larger diameter. Since I'm using the 'Status' field to identify which pipes are active/ON in a particular Facility Set I changed the 'Status' of the existing pipes, which are proposed to be upsized, so they would be OFF and the new (larger) pipes ON in the new scenario, which worked fine. However, because those existing pipes now have a different 'Status' they ended up turned OFF in ALL the other scenarios in the model. Therefore, I had to modify the other Facility Sets to keep them turned ON. Is there a better way to accomplish this without impacting ALL the other scenarios in the model? In lieu of changing the 'Status' of the pipes proposed to be upsized could I use a different field (such as Phase) to toggle them OFF for just my new scenario and not impact ALL the other scenarios?