View Poll Results: Favourite issues

Voters
0. You may not vote on this poll
  • River build procedure is tedious and “build all” never seems to work

    0 0%
  • Bridge build procedure is tedious and not related to information we’re liable to have to hand

    0 0%
  • Sampling bank lines from DTM takes no account of mesh zones, so you have to manually edit

    0 0%
  • 3D view with river reaches – impossible to tell whether bank lines are good or not

    0 0%
  • Banks seem to be the place for instabilities, often for no apparent reason

    0 0%
  • No sediment transport on 2D mesh

    0 0%
  • GPU – only produced limited data on volume balance in log file

    0 0%
  • Previous views – more than one would be helpful, as in IWCS

    0 0%
  • Exporting results – still have to navigate to folder EVERY time

    0 0%
  • Anything else? Let me know!

    0 0%
Multiple Choice Poll.
Results 1 to 3 of 3

Thread: ICM undocumented features/ niggles

  1. #1
    Senior Member
    Join Date
    Feb 2013
    Posts
    125

    Question ICM undocumented features/ niggles

    Having used ICM from the start, I've accumulated a number of niggles, wishlist items and plain old gripes - though I may well have missed some of them being resolved by recent updates. That's part of the problem - there's so much in the program that it's easy to miss things. I've added a poll based on some of my favourites, I'd very much like to know what other users have issues with and see if we can't encourage Inovyze to deal with them. The poll is my starter for 10 (maximum nuber allowed), feel free to post others as replies to the thread or let me know some other way. I aim to have results to present for discussion at the User Day on 19 June - be there!
    Last edited by Kristian Ravnkilde; May 2, 2013 at 03:26 AM.

  2. #2
    Forum Moderator

    Innovyze Employee



    Join Date
    Jan 2013
    Posts
    2
    I think you're right that a number of these niggles may have been addressed in updates and if so we can make sure that we communicate that at our upcoming user groups. So it would be good to hear if they affect other users.

    By the way Kristian, you can now register for the UK User Groups to be held in Wallingford, UK in June. On the 18th June its Water Supply, the 19th is Drainage and Flood - Modelling and then on the 20th we'll be looking at Drainage and Flooding - Real-time Operational Systems and Asset Management. Visit http://www.innovyze.com/news/events/ for more details and register for these and other upcoming events.

  3. #3
    Senior Member
    Join Date
    Feb 2013
    Posts
    125
    Today's "other" from me is bridge details, including openings, not showing in long sections - an obvious thing to want. All we get now is a strange void!

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •