Hello,

I am trying to carry out a continuous simulation over approximately 6 months. Within my model I have a number of outfalls which require a level file to correctly model tidal levels throughout this period. I noticed that there appears to be a limit on the number of days that a level file can be used for, 99 days, after which the level file states no further records can be included in the Editor. Is there any way to bypass this and extend the time period within the level file?

Duncan Kitts
November 19, 2015, 09:46 AM
Hi,

I would guess this is because you are using relative dates? 99 days is the limit when using relatives dates.

MSelf
January 20, 2016, 04:36 AM
Hi Duncan,

Yes I was using relative dates, so the issue was resolved by using calendar dates instead.