Hello,

I am currently working on the verification of a small combined sewer catchment in Infoworks ICM. I am trying to create observed vs predicted graphs for the level in the pump station. I have an incoming sewer going to a storage node and have two outgoing rising mains representing duty/assist pump arrangement. (see image attached) When I do the observed vs predicted report I add a selection list with the storage node. However, the node does not appear when I try to match it to the depth monitor. I can graph the depth vs time separately for observed and predicted but I want them on the same graph for comparison purposes.

Does anyone know how to solve this?

Many thanks,

Gearoid

Pump Station.JPG